Water Projects 1
Zahedan Water Transition Refurbishment
Gil Co. supplied following electromechanical equipment to refurbish old pumping stations of Zahedan First Water Transition Project in 2015-16.
- 4 Siemens old Slip-Ring motors 1550 kW, 6.3 kV replaced with MENZEL motors.
- 4 CLA-VAL old Control Valves 350 mm, 50 bar replaced with new CLA-VAL Control Valves.
All new electromechanical equipment were replaceable electrically, mechanically and dimensionally with old electromechanical equipment and installed without any modification at the site.
For visiting of the project pictures gallery, please click here.
For more information, please Contact Us. Top ▲